Demand and capacity, finally on the same screen.

A maker of industrial furnaces runs dozens of customer projects in parallel — production, assembly, on‑site installation: the real capacity of each trade sets the delivery date.

Manufacturing

Production hall: four operators in front of a running furnace, under walkways and pipework.

+30%

resource utilization, with workload consolidated across the entire portfolio.

The problem

What you deal with today.

  1. 01

    Each project's workload is known; the group's never is.

  2. 02

    Over‑allocations show up when the project is already slipping.

  3. 03

    Reinforcements are decided in crisis meetings.

Interactive demo

A new order, its impact on your workshops

Generate a furnace schedule from your standards and see at once its workload against capacity.

Portfolio capacity planning — interactive demo

Chapters

  1. A new furnace is ordered
  2. Your quantities drive the schedule
  3. The impact, before you even approve
  4. The furnace joins the portfolio
  5. Workload and capacity, on the same screen

At the last step: “See it on your data” → demo request.

How it works

What you do with OFFOLIO.

  1. 01

    Consolidate the workload of every project against capacity by trade and by site

  2. 02

    Spot the breaking points months ahead

  3. 03

    Rebalance with scenarios (shifts, priorities, reinforcements)

  4. 04

    Make trade‑offs based on project value

  • +30%

    resource utilization

  • −40%

    planning time

  • +25%

    projects delivered on time

  • < 3 months

    to go‑live

“OFFOLIO brings our sales and operations plan under control and makes our strategic S&OP decisions more reliable. Its generative capabilities speed up the process and let us factor in valuable assumptions to optimize our P&L.”
Engineering Director, Fives Stein

Module:SMART PPM

Frequently asked questions.

How long does it take to consolidate our portfolio?
Less than 3 months in practice, including migration of existing projects and integration with your enterprise systems.
Do we have to give up our planning tools?
No: SMART PPM consolidates workload from your existing tools.
At what level of detail is capacity tracked?
By trade, by period and by site, depending on the granularity of your data.

Your capacity is finite. Your options aren't.