Use case · SMART PPM · Nuclear

Expand an operating nuclear site. Without losing a month.

Several projects, one shared area, scarce trades and a tight deadline: when every trade‑off shifts the others, OFFOLIO compares the options before you commit to them.

Nuclear · Energy

Aerial night view of a large industrial construction site: cranes, buildings under construction and lighting.

€4M

saved in 4 months on a major energy‑sector program.

The problem

One area, several projects, not a month to spare.

A nuclear industrial site is expanding its facilities without interrupting production. Several projects work at the same time on a shared, cramped and regulated area.

  1. 01

    Imposed deadlines, with no float to absorb any slippage.

  2. 02

    A ramp‑up that runs into scarce resources: trades in short supply, certified skills, qualified contractors.

  3. 03

    Dense concurrent work on a constrained area: every job depends on the ones around it.

Interactive demo

Your scarce trades, your real lead times

Ten projects on one site: simulate the qualified welders you really have and see the cost of delays before you decide.

Nuclear site extension — interactive demo

Chapters

  1. Ten projects, one shared area
  2. Your scarce trades
  3. Turn the constraint on
  4. Recalculate
  5. Run the simulation
  6. Delays have a price
  7. Two programmes, side by side

At the last step: “See it on your data” → demo request.

How it works

From option to decision, in four steps.

  1. 01

    Consolidate the program

    Every project in the area, with its milestones and resources, in a single system of record.

  2. 02

    Set the real constraints

    Capacity by trade, certifications, access and concurrent‑work rules by sub‑area, ramp‑up curves.

  3. 03

    Simulate the options

    Sequencing, reinforcements, shifts, work phasing: every option is simulated and costed.

  4. 04

    Make the call, then manage

    The chosen option becomes the baseline schedule; capacity gaps are tracked continuously.

  • Deadlines met under real constraints

  • Scarce resources assigned where they matter

  • Concurrent work anticipated, area by area

  • Traceable decisions for program leadership

“In 4 months, OFFOLIO helped us save up to €4M on a strategic program.”
Major energy-sector program

Module:SMART PPM

Frequently asked questions.

Can concurrent work be modeled area by area?
Yes: each sub‑area carries its own access and simultaneity rules, which the scenarios respect.
How are scarce resources handled?
Their real capacity, certifications included, is a constraint of the engine: any scenario that exceeds it is flagged.
Can we compare several phasing options?
Yes: each option is simulated on the same data and compared on duration, workload and cost.

A tight program is won before the first shovel hits the ground.