Building a data center means answering tenders where everything moves fast: hundreds of pages to analyze, a schedule to build, a commissioning date to commit to — on an impossible deadline.
Construction · Data centers

−85%
less time on the initial schedule: from 2–3 weeks to 2–3 days.
The problem
Every data center tender replays the same race.
A contractor bids on data center tenders: civil works, building, electrical and cooling packages, commissioning. The bid schedule is built at the same time as the cost estimate, under the pressure of the submission deadline.
- 01
Hundreds of pages of specifications — civil works, electrical, cooling — to analyze on a tight deadline.
- 02
A bid schedule built by hand, package by package, that no one has time to challenge.
- 03
A commissioning date committed on fragile assumptions.
Interactive demo
Your bid schedule from three sentences
Describe your project to OFFOLIO's AI: work packages, links and the schedule build themselves.

Chapters
- Describe your bid
- Approve the work packages
- Open your schedule
- Your bid schedule is ready
At the last step: “See it on your project” → demo request.
How it works
What you do with OFFOLIO.
- 01
Upload the bid documents
Tender documents, technical specifications, drawings — or describe what you need in a prompt.
- 02
The AI analyzes
Requirements, constraints, and your practices, learned from your past projects.
- 03
The schedule generates
Logic‑driven, with workload and cost estimate.
- 04
Iterate and commit
Compare variants, commit with full knowledge of the trade‑offs.
2–3 days
for the initial schedule, versus 2–3 weeks
Workload & cost estimate
generated alongside the schedule
Your standards
learned from your past projects
Traceable bid
robust, defensible at the bid presentation